ATS SOCOMEC - AN OVERVIEW

ATS Socomec - An Overview

ATS Socomec - An Overview

Blog Article

ช่วยให้คุณสะดวกสบาย ไม่ต้องคอยเปิด-ปิดเครื่องใช้ไฟฟ้าด้วยตัวคุณเอง วิธีใช้งาน คำแนะนำ ข้อควรระวัง คุณสมบัติ

Great Grid, storage for integrating renewable Power and islanding Paradise, a smart network for the local people Solenbat optimises the Energetic energy efficiency of properties Stem, Power storage units for lessened electrical energy billing Innovation Close

In addition to their built-in electrical power and energy measurement capabilities (using a two% precision degree), programmable inputs/outputs can be utilised to regulate load shedding according to a load amount or tariff.

ATyS t and g switches present considerable time preserving for the duration of commissioning (system usually takes 2 to 3 minutes). Owing to the look which allows commissioning by way of just two potentiometers (4 about the ATyS g) and 4 DIP switches, a scrrewdriver is everything is necessary to configure the parameters.

For extra simplicity, In addition they give an autoconfiguration function which enables automatic adjustment in the rated voltage and frequency.

Immune to voltage fluctuations The power supply from the ATyS p M is only Lively through transfer. Because the product is predicated on secure positions, It isn't afflicted by community voltage fluctuations.

Risk-free handbook manage The ATyS DT makes sure the safety of the routine maintenance personnel because of patented protection attributes. Entry to the handbook handle is prohibited by a clear polycarbonate address requiring deliberate action to open.

Quick commissioning On Original electric power up, the ATyS C65’s good wizard will information the operator through the commissioning course of action.

Assurance an final redundancy for emergency gensets Back up the whole distribution proper up for the vital loads Field Near

5kW – DKPP1-4020AB 4P 20AAC21AC23A 415V: 20A: 5.5kW 1NO+1NC DKPP1-4032AB 4P 32AAC21AC23A 415V: 32A: 11kW 1NO+1NC DKPP3-4040AB 4P 40AAC21AC23A…

Remote control interface Exclusively suitable for installations the place the product is enclosed, the distant interface shows item standing on the front panel (D10) or shows and here controls with usage of programming (D20).

Excursion purpose ATyS p M incorporates a operate for returning on the 0 placement in case of the loss of each electricity provide resources (tripping). This shields the load from difficulties as a consequence of supply instability.

Remember to insert the day and time the flight can take off, as educated by the airline. The pick-up time will likely be calculated instantly bearing in mind journey time and Test-in time at airport.

Transfer Swap Selector Uncover the switching solution to improve your installation The net configurator that can help you locate the very best switching equipment in your installations from 16A to 6300A.

Report this page